Concept Design to 100% DD Electrical Design Building Services

Its easy to say we can convert an electrical drawings from concept stage to Detailed Design stage for IFC, but only an experienced electrical engineer can understand what it means to complete to do this, this involves the following,

  • Understanding the architectural drawings and scope of the works very well

  • Informing any pre assumptions and risks involved

  • Preparation of spatial allowances for Main switchboards with allowance for space provision for PFC and AHF, DB cupboards and Electrical riser, Comms rooms with enough clearances for racks and security panels

  • Single Line Diagram Development to detailed design stages such as circuit breakers, cable sized properly to suit the voltage drops and fault levels and dault loop impedence levels, and full discrimination studies using powerCAD/ETAP software

  • Lighting design simulations completed using the AGI32 software and making a lighting layout that complies AS 1158, AS 1680, AS 4282

    • Any alternate packages to be offered to save money for the client

    • Section J7 calculations completed

  • Power drawings to calculate the load demand etc

  • DNSP applications checked

  • Maximum demand calculations finalised based on equipment selections

  • Emergency and exit lighting design layouts completed in accordance with latest NCC and Fire Engineers reports

    • CAD drafting of the layouts for lighting and power

  • Lightning protection check done

  • Any UPS or Generator connection in SLD and sizing to cater loads

  • Cable tray sizings, and conduits

  • Life safety equipement identification such as lift and FIP etc

  • Green star requirements compilation

    • Credit 11

    • Credit 16

    • Credit 27

  • Australian Strandards compliance checks

Thats a lot of documents and design check to be completed so dont waste your peace of mind with someone who is not registered. Contact us for a obligation free quote for the works.